Article
Publication date: 17 April 2020

Duc Hoc Tran

Project managers work to ensure successful project completion within the shortest period and at the lowest cost. One of the main tasks of a project manager in the planning phase…

Abstract

Purpose

Project managers work to ensure successful project completion within the shortest period and at the lowest cost. One of the main tasks of a project manager in the planning phase is to generate the project time–cost curve, and furthermore, to determine the most appropriate schedule for the construction process. Numerous existing time–cost tradeoff analysis models have focused on solving a simple project representation without regarding for typical activity and project characteristics. This study aims to present a novel approach called “multiple-objective social group optimization” (MOSGO) for optimizing time–cost decisions in generalized construction projects.

Design/methodology/approach

In this paper, a novel MOGSO to mimic the time–cost tradeoff problem in generalized construction projects is proposed. The MOSGO has slightly modified the mechanism operation from the original algorithm to be a free-parameter algorithm and to enhance the exploring and exploiting balance in an optimization algorithm. The evidential reasoning technique is used to rank the global optimal obtained non-dominated solutions to help decision makers reach a single compromise solution.

Findings

Two case studies of real construction projects were investigated and the performance of MOSGO was compared to those of widely considered multiple-objective evolutionary algorithms. The comparison results indicated that the MOSGO approach is a powerful, efficient and effective tool in finding the time–cost curve. In addition, the multi-criteria decision-making approaches were applied to identify the best schedule for project implementation.

Research limitations/implications

Accordingly, the first major practical contribution of the present research is that it provides a tool for handling real-world construction projects by considering all types of construction project. The second important implication of this study derives from research finding on the hybridization multiple-objective and multi-criteria techniques to help project managers in facilitating the time–cost tradeoff (TCT) problems easily. The third implication stems from the wide-range application of the proposed model TCT.

Practical implications

The model can be used in early stages of the construction process to help project managers in selecting an appropriate plan for whole project lifecycle.

Social implications

The proposal model can be applied to multi-objective contexts in diversified fields. Moreover, the model is also a useful reference for future research.

Originality/value

This paper makes contributions to extant literature by: introducing a method for making TCT models applicable to actual projects by considering general activity precedence relations; developing a novel MOSGO algorithm to solving TCT problems in multi-objective context by a single simulation; and facilitating the TCT problems to project managers by using multi-criteria decision-making approaches.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 July 2018

Duc Hoc Tran and Luong Duc Long

As often in project scheduling, when the project duration is shortened to reduce total cost, the total float is lost resulting in more critical or nearly critical activities…

1128

Abstract

Purpose

As often in project scheduling, when the project duration is shortened to reduce total cost, the total float is lost resulting in more critical or nearly critical activities. This, in turn, results in reducing the probability of completing the project on time and increases the risk of schedule delays. The objective of project management is to complete the scope of work on time, within budget in a safe fashion of risk to maximize overall project success. The purpose of this paper is to present an effective algorithm, named as adaptive multiple objective differential evolution (DE) for project scheduling with time, cost and risk trade-off (AMODE-TCR).

Design/methodology/approach

In this paper, a multi-objective optimization model for project scheduling is developed using DE algorithm. The AMODE modifies a population-based search procedure by using adaptive mutation strategy to prevent the optimization process from becoming a purely random or a purely greedy search. An elite archiving scheme is adopted to store elite solutions and by aptly using members of the archive to direct further search.

Findings

A numerical construction project case study demonstrates the ability of AMODE in generating non-dominated solutions to assist project managers to select an appropriate plan to optimize TCR problem, which is an operation that is typically difficult and time-consuming. Comparisons between the AMODE and currently widely used multiple objective algorithms verify the efficiency and effectiveness of the developed algorithm. The proposed model is expected to help project managers and decision makers in successfully completing the project on time and reduced risk by utilizing the available information and resources.

Originality/value

The paper presented a novel model that has three main contributions: First, this paper presents an effective and efficient adaptive multiple objective algorithms named as AMODE for producing optimized schedules considering time, cost and risk simultaneously. Second, the study introduces the effect of total float loss and resource control in order to enhance the schedule flexibility and reduce the risk of project delays. Third, the proposed model is capable of operating automatically without any human intervention.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 25 April 2022

Duc-Hoc Tran and Putri Basenda Tarigan

The concept of sustainability is about the relationships among people, the planet, and profit. Nowadays, it has been spread to many areas, including construction projects

Abstract

The concept of sustainability is about the relationships among people, the planet, and profit. Nowadays, it has been spread to many areas, including construction projects. Sustainability in construction projects has been so important in the present time. It is commonly pointed to the environment and construction materials. Nevertheless, it is also important in construction management which addresses sustainable project scheduling. Sustainable project scheduling will help to deliver the project under the deadlines, within the available budget, and also ensuring about the quality of the works. This study presents the trade-off among time, cost, and quality in the construction project to provide the decision-maker some alternative solutions in the planning phase to conduct a sustainable construction project. Multi-objective optimisation using Symbiotic Organism Search (SOS) algorithm is done to find the best solutions to the problem under investigation. Then, fuzzy logic approach is utilised to model the diverse environment and uncertainty in the construction project. A case study in repetitive construction project is analysed to see the capability of the model to work in time cost quality trade-off to reach into a sustainable construction project.

Content available
Book part
Publication date: 25 April 2022

Abstract

Details

Sustainability Management Strategies and Impact in Developing Countries
Type: Book
ISBN: 978-1-80262-450-2

Abstract

Details

Journal of Intelligent Manufacturing and Special Equipment, vol. 4 no. 1
Type: Research Article
ISSN: 2633-6596

1 – 5 of 5